Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Aug 20, 2017 06:13:19 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Aug 20, 2017 06:13:19 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by scatman05
Page#    6 Blog Entries  next>>
  
0 Followers
1565 views
May 25 2012 (13:32)   12223/Mumbai LTT - Ernakulam AC Duronto Express
 

scatman05   5 blog posts   1 correct pred (100% accurate)
Entry# 435059            Tags   Past Edits
Does this train LTT ERS Duranto halt at Shornur. If yes for how many minutes/

  
1383 views
May 25 2012 (13:35)
Guest: 6061947e   show all posts
Re# 435059-1            Tags   Past Edits
Looks, there is no halt @ Shoranur.

  
1319 views
May 28 2012 (18:46)
scatman05   5 blog posts   1 correct pred (100% accurate)
Re# 435059-2            Tags   Past Edits
Thanks
  
0 Followers
801 views
Aug 21 2011 (14:50)  
 

scatman05   5 blog posts   1 correct pred (100% accurate)
Entry# 224310            Tags   Past Edits
What does General/WL signify.
If i want availability of KCVL to Panvel it shows: General/WL 9
while if I want KCVL ASR its shows WL/1
what does both mean? Thanks

  
644 views
Aug 22 2011 (01:58)
Vinay Kumar~   15591 blog posts   360 correct pred (78% accurate)
Re# 224310-1            Tags   Past Edits
It simply means, availability in General Quota is - WL#9 or WL#1

  
584 views
Aug 22 2011 (08:22)
Prabhakar Agarwal   8008 blog posts   4880 correct pred (61% accurate)
Re# 224310-2            Tags   Past Edits
Both the station from KCVL to PNVL & KCVL to ASR have different qouta in Train No 12483
So, its showing like that
  
Predictions: 29
confirm: 29
rac: 0
wl: 0
Journey: Wed Nov 09, 2011 @ 12:10
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 2
Travel: SHG/Shahganj Junction   to   LTT/Lokmanya Tilak Terminus   |   1490 km / 1727 km
11056/Godan Express (PT)
Entry# 219843
 

Posted by: scatman05   5 blog posts   1 correct pred (100% accurate)
PNR: 265-xxxxxxx   |   Similar PNRs
Posted Status as of: Aug 14 2011 (11:19)
From: Shahganj Junction/SHG
To: Mumbai Lokmanya Tilak Terminus/LTT
Date of Journey: Wed Nov 09, 2011 @ 12:05
Class: AC 2-tier - 2A
Passenger 1: RAC 3 (Booking Status: RAC 3,GNWL)
Passenger 2: RAC 4 (Booking Status: RAC 4,GNWL)
Passenger 3: Waitlist# 1 (Booking Status: W/L 1,GNWL)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Nov 02 2011 (11:50)
Passenger 1: Can/Mod (Booking Status: RAC 3,GNWL)
Passenger 2: Can/Mod (Booking Status: RAC 4,GNWL)
Passenger 3: Can/Mod (Booking Status: W/L 1,GNWL)
Chart NOT Prepared
  
0 Followers
509 views
Jul 25 2011 (23:06)  
 

scatman05   5 blog posts   1 correct pred (100% accurate)
Entry# 210203            Tags   Past Edits
Can anyone help me know, whether 12223 LTT ERS Dunranto serves dinner on the first night . dep time is 2050 hr.
And how do we know whats in the menu for, lets say, the 13th August train.
Thanks.
  
Predictions: 15
confirm: 10
rac: 0
wl: 5
Journey: Sat Apr 30, 2011 @ 17:47
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 2
Travel: KAWR/Karwar   to   LTT/Lokmanya Tilak Terminus   |   624 km / 882 km
12620/Matsyagandha Express (PT)
Entry# 139454
 

Posted by: scatman05   5 blog posts   1 correct pred (100% accurate)
PNR: 454-xxxxxxx   |   Similar PNRs
Posted Status as of: Apr 15 2011 (15:43)
From: Karwar/KAWR
To: Mumbai Lokmanya Tilak Terminus/LTT
Date of Journey: Sat Apr 30, 2011 @ 19:25
Class: AC 2-tier - 2A
Passenger 1: Waitlist# 13 (Booking Status: W/L 20,PQWL)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Apr 30 2011 (14:13)
Passenger 1: Waitlist# 3 (Booking Status: W/L 20,PQWL)
Chart PREPARED

  
687 views
Apr 20 2011 (16:21)
Sajid Khan   1337 blog posts   23338 correct pred (62% accurate)
Re# 139454-1            Tags   Past Edits

Status Last Updated on: Today (4:21PM) IST
Date of Journey: Sat Apr 30, 2011 Class: AC 2-tier - 2A
Passenger 1: Waitlist# 7 (Booking Status: W/L 20, PQWL)
Chart NOT Prepared
Page#    6 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Aug 30
Trains with ARP 15 Dep on: Mon Sep 4
Trains with ARP 30 Dep on: Tue Sep 19
Trains with ARP 120 Dep on: Mon Dec 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.