Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jan 23, 2017 18:17:57 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jan 23, 2017 18:17:57 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Djoko out~
Page#    1229 Blog Entries  next>>
  
General Travel
0 Followers
2297 views
Jan 18 2017 (08:03)  

Hum safar express idea is total flop^~   77466 blog posts   5080 correct pred (77% accurate)
Entry# 2130918            Tags   Past Edits
Projects going all over India
This is list of projects going all over India in various zones
Please update your zones project here I will add in main blog with credits
.
CR
ECR
...
more...
- DFC , Digha Bridge Doubling,Muzaffarpur Hajipur Doubling,Ramdayalu Hajipur Doubling ( By Subrat)
Narkatiyaganj Raxaul Gc , Bakhtiyarpur Rajgir Electrification (By Rahul )
ER - Rampurhat Malda Electrification , Bardhman Bandel 3rd line , Dankuni Bally 3rd line , Gauge Conversion Balgona Katwa ( By Rahul )
Sainthia -Rampurhat 3rd line with electrification , Chandanpur-Dankuni 4th line with electrification , Ahmedpur-Katwa gauge conversion , Katwa - Azimganj electrification , CC link doubling ( By Debarathi)
ECoR - Khurda Road- Bolangir, Paradeep - Haridaspur, Talcher- Bimalgarh, Puri- Konark, Jagdalpur- Rayagada Doubling, Titlagarh- Visakhapatnam Doubling, Raipur - Titlagarh Doubling, Sambalpur- Talcher- doubling, Talcher- Cuttack tripling, Nergundi- Bhadrak tripling, ( By afraaz)
KR - Roha to Veer Doubling , Roha to Thokur Electrification ( by Konkan)
NCR - DFC
NER
1. Ongoing doubling and electrification of ALY-MUV-BSB-ARJ-GCT-BUI-CPR in which doubling is completed between Varanasi City and Aunrihar Jn. rest is under process and is expected to be completed till 2019-20. ( By Bruce Wayne )
2. Construction of new line connecting BSB-AMH-GKP. ( By Bruce Wayne )
3. Construction of new line connecting MAU to TARIGHAT i.e. NER to ECR project has been started. New line is via Ghazipur Ghat station to Tarighat. ( By Bruce Wayne )
5. Electrification of single diesel line from Kanpur Anwarganj - Farrukhabad. ( By Bruce Wayne )
6. Electrification of single diesel line from Rampur Jn.- Kathgodam. ( By Bruce Wayne )
7. Construction of ELS at GorakhpurJn. , Construction of DEMU shed at Aunrihar Jn. & Construction of Basic Training Centre at Ghazipur. ( By Bruce Wayne )
8. Gauge conversion ASH-STP-MLN & GD-BRK ( By Ravi Prakash Shukla )
NFR- New Domohani New Alipurduar Doubling(excluding Jaldhaka, Torsa R. Bridge),KIR RQJ electrification,New y link at New Jalpaiguri ( By Prabir ji )
NR
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Mavli - Barisadri , Udaipur - Himmatnagar , Electrification in Ajmer Palanpur, Ajmer Udaipur , Rewari - Phulera
NL dausa ganagapur city , Dungarpur banswara ratlam , Thiyat sanu hamira ( by riz)
SCR
Guntakal-Wadi electrification and doubling - close to completion
Peddapalli-Nizamabad - Close to completion
Guntur-Guntakal-Bellary electrification - On-going, Guntur-Guntakal stretch in good progress.
Bhimavaram-Gudivada-Vijayawada Electrification and doubling - On-going ( Work had practically stopped due to lack of funds, the last time I checked)
Bidar-Gulbarga - Was struggling due to land issues, now going at a brisk pace.
Guntakal-Dharmavaram Doubling - No progress
Kacheguda-Mahbubnagar doubling -
Secunderabad-Bolarum electrification - On-going, poles erected.
Parbhani-Mudkhed doubling - Slow progress
Obulavaripalle - Krishnapatnam - On-going, Earth work completed for the entire route.
Vijayawada-Balharshah tripling - On-going, a short section on the Balharshah end is almost completed ( correct me if I am wrong).
Nadikude-Venkatagiri - Survey going on for land acquisition
Kotipalli - Narsapuram - Survey going on for Kotipalli-Amalapuram section, Tenders to be called soon for New Godavari Bridge.
Akola-Akot gauge conversion - Yet to begin. ( By D S P Anirudh )
SECR - dalli rajhara - raoghat- jagdalpur , korba - pendra road and balaghat- nainpur - sukrimangla guage conversion, raipur -durg tripling , jharsugda- bilaspur quadrupling ( By saurabh)
SER
SR
PTJ-POY gauge conversion. ( By Aditya Siddharth) , Villupuram Dindigul doubling, Takkolam Arakkonam new line, Pollachi Podanur Gauge conversion, Sengottai Punalur Gauge Conversion, Charvattur Mangalore electrification, Erode Trichy electrification. ( BY SOURAV)
SWR
electrification of MYS-SBC and doubling at S. ( By Aditya Siddharth)
Tumkur Kalyandurga new line, Doubling of Yelhanka to Dharmavaram, Hubli to Tumkur Doubling, Guntakal to Vasco da gama doubling ( BY SOURAV)
WCR - Kota Bina doubling , Itarsi Allahabad Electrification
WR - DFC ,
New Line --- Dahod Indore , Chhotaudepur dhar, Somnath kodinar , Patan bhildi , Modasa shamlaji
Gauge conversion ---Kalol mahesana tarnga hill , Ahmedabad himatnagar , Bhuj naliya , Ahmedabad botad , Jetalsar dhasa
Doubling -- Udhna jalgaon , Viramgam samakhiyali , Palanpur samakhiyali , Surendranagar RAJKOT , Vatwa Ahmedabad 3rd line , Vtwa Ahmedabad , Sabarmati 3 n 4 th line , Chitourgadh nimuch , Indore dewas ujjain
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )

46 posts are hidden.

  
33 views
Today (17:59)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2130918-50            Tags   Past Edits
SWR:
Its not full Hubbali-Tumakuru doubling as already Chikjajur-Arsikere is doubled. Its actually Hubbali-Chikjajur and Arsikere-Tumakuru doubling.
Departure: Yesterday @ 12:05
12381/Poorva Express (via Gaya) (PT)
Trip# 102398    Traveller: DhnEcr~    Linked PNR Entry# 2135350
Class: AC 3-tier - 3A
From: DHN/Dhanbad Junction
To: NDLS/New Delhi
21 wishes
HJ HJ HJ HJ HJ HJ HJ HJ Happy Journey HJ HJ HJ HJ HJ HJ HJ HJ HJ & safe journey Happy journey bhai... HJ HJ Apki yatra subh ho
TRIP HAS ENDED.
Blog  Time-Table

42 posts are hidden. Click to open.

  
157 views
Yesterday (15:12)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2135350-43            Tags   Past Edits
Isn't it better to go via BSB than covering MGS-ALD route ??
Also I think PNBE route has more halts than BSB Poorva..

1 posts are hidden. Click to open.

  
174 views
Yesterday (15:50)
rajeevame~   1787 blog posts   70 correct pred (66% accurate)
Re# 2135350-45            Tags   Past Edits
12381 has 9 stops in between asn and mgs whereas 12303 has a staggering 14 stops in between asn-mgs. (Both stn asn and mgs excluded)

  
196 views
Yesterday (15:52)
DhnEcr~   4106 blog posts
Re# 2135350-46            Tags   Past Edits
Prayag - Allahabad is a bigger pain in back. Besides poorva gets caught in crossover problem being on pf 7,8

71 posts are hidden. Click to open.
  
General Travel
0 Followers
250 views
Yesterday (15:27)   16582/Shivamogga Town - KSR Bengaluru Express

Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Entry# 2136078            Tags   Past Edits
Good patronage for the new train, SL & 3A classes in WL & 2A in RAC for today's SMET-SBC run.
  
★  General Travel
1 Followers
1376 views
Yesterday (00:12)   18448/Hirakhand Express | KNRT/Kuneru

SRG*^~   34963 blog posts   151684 correct pred (75% accurate)
Entry# 2135391            Tags   Past Edits
Flash News
Hirakhand Express Derails near Komaraada...

34 posts are hidden.

  
359 views
Yesterday (13:50)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2135391-37            Tags   Past Edits
Are track circuits present in IR or are they implemented only in high density routes ??

  
335 views
Yesterday (14:06)
180 years of Railways in India~   2137 blog posts
Re# 2135391-38            Tags   Past Edits
They are implemented pretty much on all the routes which have signalling systems, but it is not utilized fully, like having automatic blocks and automatic signalling. In many railway systems, track circuits are also used to monitor the track conditions. It is quite possible to upgrade the track circuits to automatically turn signals to red upon detecting a broken piece of track, and with some advanced features, it is possible to identify large irregularities like an incompletely sawn-off track. IR did some experiments with such signalling systems on some routes, but mostly the equipment was stolen.

2 posts are hidden.
  
Poll
0 Followers
850 views
27 votes
Jan 21 2017 (01:13)  

Foamer~   892 blog posts
Entry# 2134334            Tags   Past Edits
Do you like travelling in passenger trains, where the train stops at almost every station and waits endlessly for freight/other Exp, SF trains to cross/overtake them? If so, please share your memorable experiences of the journey, comfort and the little wayside stations enroute.
Yes. I like to travel by passenger trains.59%16
I don't like them. but will travel if needed.41%11
I will never set foot in a passenger train in my life.0%0

3 posts are hidden.

  
329 views
Jan 21 2017 (20:11)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2134334-4            Tags   Past Edits
1. Travelled from VSKP-Eluru in VSKP-BZA Passenger day time pass. Me & my brother had planned for this journey, but he dropped in the last moment and I continued the journey.
Too many express trains overtook it, lunch was a problem as no where I got proper food. Due to so many overtakes it ran some 2hrs late though started on time from VSKP. Totally took 10hrs for VSKP-EE where expresses take 5hrs max.
2. Later me & my bro again planned for night out journey for VSKP-EE stretch in Rayagada-BZA pass which
...
more...
is even overtaken by freights. It stopped at Nidadavolu for 1.5hrs during which the freights it overtook on the way again overtake the pass back. We were completely drained of energy by morning due to night out and reached EE at 7AM.

  
385 views
Jan 21 2017 (20:47)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2134334-5            Tags   Past Edits
Next plan is to go by SBC-UBL day pass, good number of crossings would be there.

6 posts are hidden.
  
★★★  General Travel
2 Followers
1741 views
Jan 20 2017 (17:26)  

Indian Railways the life line of our Nation~   10278 blog posts   133 correct pred (85% accurate)
Entry# 2133832            Tags   Past Edits
3 compliments
nice work. Flashback Nice post.
Old Memories of IRI
I joined IRI 1yrs ago.I wants to know that when was iri made,how it looks 6-7yrs ago.I thinks many members who joins from 2013 till now also wants to know how iri looks when itis first made.After thinking all this i start researching of IRI.After spending 2-3hrs on internet and a lot of hard work i finally found that IRI is made on September 2008.In 2008 probaly no one joined iri,and on 2009 only 20-30approx members is on iri.
After spending some more time i manages to found pics
...
more...
of iri from 2008 to till now.I have many pics of iri from 2008 to till now.Every body have look.
Pic1&2-Rajdhani train list of IRI in 2008
Pic3to5-Main Forum of IRI in 2009.Some discussions going on
Pic6-AK Rajdhani in IRI in 2009.Must watch the epic comments on this train😂😂.Zoom this pic for better view.
Pic7&8-Trains list of IRI in 2010
Pic9-Gorakhpur Junction in IRI in 2011.
Pic10-List of pending trains in IRI in 2011.Currently all of them are running on tracks😎😎😎
Pic11-Main Forum of IRI in 2012
Pic12to14-Main Forum of IRI in2013
Pic15&16-Main Forum of IRI in 2014
Pic17-Muzaffarpur Junction in IRI in 2015
Pic18-Sampoorna Kranti in IRI in 2015
Pic19-Main Forum of IRI in 2016
No pics of 2017 bcoz you all knows how iri looks today😁😁😁
Source-click here

26 posts are hidden.

  
212 views
Jan 20 2017 (20:45)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2133832-28            Tags   Past Edits
Now SBC Raj became daily on the same slot, so SC Raj's timings got changed. Those days, SBC raj was only tri-weekly via Raichur.

42 posts are hidden.
  
General Travel
0 Followers
1386 views
Jan 07 2017 (08:10)   12740/Secunderabad- Visakhapatnam Garib Rath Express

utkal andhra~   688 blog posts
Entry# 2118570            Tags   Past Edits
REAL GARIBS are living in SRIKAKULAM district . But S.C.Railway is not in favor of extending the GARIB RATH EXPRESS up to PALASA. It is high time the train is extended up to PALASA to provide a chance to the people of sklm district to experience the travel by AC coaches.

6 posts are hidden.

  
258 views
Jan 20 2017 (11:55)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2118570-8            Tags   Past Edits
But I feel there is no chance of extending till BBS as now GR rakes are not being manufactured and its frequency cannot be reduced, so wont it be good if its extended till Palasa & returning the same day ??

  
274 views
Jan 20 2017 (11:59)
SLA   967 blog posts
Re# 2118570-9            Tags   Past Edits
Let IR give another rake of GR, even then GR won't go beyond VSKP

10 posts are hidden.
  
★  Info Update
0 Followers
1537 views
Jan 16 2017 (10:54)   16581/KSR Bengaluru - Shivamogga Town Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)

IR no more Safe   17285 blog posts   93220 correct pred (74% accurate)
Entry# 2128882            Tags   Past Edits
Introduction of 16581/82 tomw with spcl TT.

15 posts are hidden.

  
578 views
Jan 17 2017 (20:09)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2128882-16            Tags   Past Edits
SMET should also get pitlines which would help it to connect trains to other parts of KA like BGM/Vijayapura/Gulbarga.

  
554 views
Jan 17 2017 (20:12)
IR no more Safe   17285 blog posts   93220 correct pred (74% accurate)
Re# 2128882-17            Tags   Past Edits
i believe every small big stn should have at least 1 or 2 pitlines for 15-16 coaches, so that basic PM can be done.
Why bigger stn always take the load.

3 posts are hidden.
Departure: Mon Jan 16 2017 @ 03:53
12621/Tamil Nadu SF Express
Trip# 101980    Traveller: Àťhàŕvà070053^~    Linked PNR Entry# 2127740
Class: Sleeper - SL
From: AGC/Agra Cantt.
To: NDLS/New Delhi
4 wishes
HJ HJ in speedstar HJ HJ bro...
TRIP HAS ENDED.
Blog  Time-Table

48 posts are hidden. Click to open.

  
613 views
Jan 16 2017 (13:39)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2127740-52            Tags   Past Edits
Last week, NZM-MAS Duronto started just 15mins behind TN, trailed it all the way till MAS adding around 6hrs more delay enroute in addition to already rescheduled 7hrs..

  
360 views
Jan 16 2017 (21:13)
GOA SK TO VSG~   6160 blog posts   613 correct pred (66% accurate)
Re# 2127740-53            Tags   Past Edits
Was TN ontime then ?

1 posts are hidden. Click to open.

  
539 views
Jan 16 2017 (21:34)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2127740-55            Tags   Past Edits
TN departed NDLS ontime, reached MAS at 9:30AM (late by 2.5hrs) and Duronto reached MAS at 10AM.

7 posts are hidden. Click to open.

  
743 views
Jan 17 2017 (14:02)
Hum safar express idea is total flop^~   77466 blog posts   5080 correct pred (77% accurate)
Re# 2127740-63            Tags   Past Edits
Very poor controlling....

12 posts are hidden. Click to open.
  
★★★  Rail Fanning
1 Followers
1422 views
Jan 16 2017 (13:13)   66535/KSR Bengaluru City - Ramanagaram MEMU | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)

Foamer~   892 blog posts
Entry# 2129079            Tags   Past Edits
Bengaluru - Ramanagaram Inaugural MEMU at SBC.

1 posts are hidden.

  
433 views
Jan 16 2017 (13:21)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2129079-2            Tags   Past Edits
1 compliments
Waiting for trains to MYS...
Woww, the first electric on MYS route !!!

8 posts are hidden.
Page#    1229 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Feb 2
Trains with ARP 15 Dep on: Tue Feb 7
Trains with ARP 30 Dep on: Wed Feb 22
Trains with ARP 120 Dep on: Tue May 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2136570
    Today (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
  • Entry# 2126247
    Jan 13 (11:57PM)


    Here are some guidelines for members regarding the new Report button and the revamped FM system: 1. If you have ANY complaint about a blog or ANY other issues, please USE the Report button and file a Complaint. Most complaints are resolved by FMs within seconds/minutes. (Some require further discussion). FMs have...
  • Entry# 2125399
    Jan 13 (08:58AM)


    Often we have some TL Entries seemingly in WaitList forever. Usually, the reason for this is that TLMs have already looked at the TL Entry but are not confident enough to Confirm it or are looking for more inputs from the Member regarding the source, etc. And this delay eventually causes...
  • Entry# 2122843
    Jan 10 (10:15PM)


    This is to address persistent and lingering questions about FM Appointments: . 1. Being an FM is a service. It is NOT supposed to be some kind of "reward" or "medal" to "deserving" members. The ULTIMATE OBJECTIVE of the process is to promptly handle/look into Reports filed by members, which is expected to...
Scroll to Top
Scroll to Bottom


Go to Mobile site