Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Nov 21, 2017 19:39:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Nov 21, 2017 19:39:29 IST

Blog Entry# 1084019
Posted: May 04 2014 (23:20)

18 Responses
Last Response: May 05 2014 (13:30)
  
Rail News
0 Followers
2150 views
Other News
May 04 2014 (22:57)   Plan to replace conventional railway coaches with LHB ones on slow track
 

Jayashree ❖ Amita*^   38182 news posts
Entry# 1084019   News Entry# 175823         Tags   Past Edits
Railways' plan to replace conventional coaches with LHB coaches for their enhanced capacity to absorb derailment impact is on slow track despite the urgent need for it. Coaches of the ill-fated Diwa-Sawantwadi passenger train, derailed between Nagothane and Roha railway stations, about 120 kms from Mumbai today, killing 17 passengers, were conventional coaches, which are prone to capsize in case of derailment.
The LHB coaches, equipped with advanced couplers and anti-climbing features, prevent capsizing of coaches in case of accident. This helps to minimise damage and reduce the loss of lives because the LHB bogies do not get toppled due to its modern design. While two coaches derailed, two coaches were capsized after the derailment of the passenger train today and maximum casualty occured
...
more...
in capsized caoches, said a senior Railway Ministry official.
However, the official said railways is planning to switch over from indigenous coaches to German technology-based Linke Holfmann Bush (LHB) ones in all trains in phases only. Currently, railways manufacture about 600 LHB coaches in Rail Coach factory in Kapurthala and Rae Bareli per year while about 3,000 conventional coaches are being produce at Integrated Coach Factory in Chennai. LHB coaches, made of stainless steel, have more in-built safety features and can absorb shock and impact of derailment more effectively.
According to the official, there is also a need to equip drivers and guards with battery operated cutting tools to speed up evacuation of passengers from capsized coaches. Battery-operated cutting tools can be made available to driver and guard for cutting windows of capsized coaches for evacuating trapped passengers before the arrival of accident relief train (ART). "One has to wait for the accident relief train to reach the site before starting the evacuation process. The battery operated cutting tools can be used in emergency to cut windows of the capsized coaches to extricate passengers in emergency instead of waiting for the ART," the official said.

6 posts - Sun May 04, 2014

7 posts - Mon May 05, 2014

  
1483 views
May 05 2014 (02:58)
GOA SK TO VSG~   6301 blog posts   613 correct pred (67% accurate)
Re# 1084019-14            Tags   Past Edits
Icf hi milega and i don't think it will get lhb soon, for somedays the officials will talk and then forget instead we may see another train getting lhb in a high speed section.
We all know how risk prone KR is but still except Rajdhani we find no lhb train.

  
1508 views
May 05 2014 (03:05)
Indian railways Project Swarn is great idea^~   87605 blog posts   5325 correct pred (78% accurate)
Re# 1084019-15            Tags   Past Edits
Only rajdhani ????
Many trains are lhb
Ltt ers drnto
Nzm ers drnto ( h lhb )

  
1113 views
May 05 2014 (11:25)
GOA SK TO VSG~   6301 blog posts   613 correct pred (67% accurate)
Re# 1084019-16            Tags   Past Edits
Durontos are also rajdhani type trains no SF/MEX trains have lhb. Konkan kanya and Mandovi deserving candidates for lhb.

  
1108 views
May 05 2014 (12:53)
srinivasvasanthi~   4143 blog posts   15 correct pred (54% accurate)
Re# 1084019-17            Tags   Past Edits
Railway Board should be tried to switch over the existing ICF couplers in the existing ICF coaches with LHB ADVANCED COUPLERS AND ANTI-CLIMBING FEATURES.
REASEARCH and DESIGNS have to be developed very fast for switching over to the LHB or OTHER ADVANCED COUPLERS AND ANTI-CLIMBING FEATURES to be replaced the existing ICF couplars .By this the intensity of the accident and derailment causality may be tremendously reduced.

  
1052 views
May 05 2014 (13:30)
GOA SK TO VSG~   6301 blog posts   613 correct pred (67% accurate)
Re# 1084019-18            Tags   Past Edits
LHB production should be given a top priority now since they have a good potential for increased safety and high speed.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 1
Trains with ARP 15 Dep on: Wed Dec 6
Trains with ARP 30 Dep on: Thu Dec 21
Trains with ARP 120 Dep on: Wed Mar 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.