Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Nov 24, 2017 22:30:04 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Nov 24, 2017 22:30:04 IST

Blog Entry# 1964999
Posted: Aug 17 2016 (09:17)

3 Responses
Last Response: Aug 17 2016 (20:55)
  
Rail News
0 Followers
1182 views
Aug 17 2016 (09:05)   CR plans to improve timings after punctuality drops to 82%
 

❤ WAP7 ❤~   1107 news posts
Entry# 1964999   News Entry# 277430         Tags   Past Edits
Newly appointed Central Railway (CR) general manager Akhil Agarwal plans to improve the punctuality of services following the five-hour rail roko on August 12.
CR's suburban punctuality has dropped to 82%. “Our main goal is improve timings. The Main line (long-distance) punctuality is 93%,“ said Agarwal.
A study carried out by the Comptroller and Auditor General (CAG) had revealed that the punctuality of trains dropped to 87.1% in 2014-15 from 95.8% in 2010-11.
“In
...
more...
2014-15, the percentage of trains running late by 10-15 minutes or more than 15 minu tes was 5 per cent each. In 201213, this figure stood at 3%,“ the CAG report mentioned.
Some officials said the CR network needs infusion of modern technology and rakes, without which punctuality could not improve.
A senior official said, “There are several rakes that are running on the system although their codal life of 25 years was over. Older rakes are prone to failure.“ “Level crossing gates on Harbour line and at Chunabhatti are responsible for the delay in operations,“ he added. CR officials said waterlogging during monsoon affects services. “Once trains had to stopped for several hours because of landslides at Parsik Hill. There has been an instance of burning garbage affecting the signalling system,“ added the official. Another view is that retrofitted rakes are prone to breakdowns. “Refurbished rakes, which were meant to run on 1500 KV direct current , have been retrofitted to make it compatible to run on 25 KV alternating current. It is jugaad technology that is bound to create problems,“ said a source.
[Click To Enlarge]

  
1856 views
Aug 17 2016 (09:17)
عمران ©®   4384 blog posts   917 correct pred (63% accurate)
Re# 1964999-1            Tags   Past Edits
even wr has no great punctuality especially in peak hour, they should also look into it

  
1607 views
Aug 17 2016 (12:31)
Obi Wan has taught you well~   3108 blog posts   1456 correct pred (72% accurate)
Re# 1964999-2            Tags   Past Edits
WR also has issues with retrofit rakes. those have lower MPS and are more prone to failure, leading to punctuality loss.

  
985 views
Aug 17 2016 (20:55)
srinivasvasanthi~   4144 blog posts   15 correct pred (54% accurate)
Re# 1964999-3            Tags   Past Edits
New terminals in ANDHERI,BORIVALI, VASAI ROAD,KALYAN ,DIVA and PANVAL have to be provided .So as from these new terminals the trains have to be operated/extended ( like DELHI METRO CITY TERMINALS ) criss crossing Mumbai outer areas so as to reduce pressures in the existing terminals.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 4
Trains with ARP 15 Dep on: Sat Dec 9
Trains with ARP 30 Dep on: Sun Dec 24
Trains with ARP 120 Dep on: Sat Mar 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.