Only if IR focuses on upgrading tracks instead of building Mumbai Ahmadabad HSR dedicated corridor. The HSR dedicated corridor will not help existing trains in IR instead upgraded HSR corridor is needed. Existing train speeds must be increased drasticly. 55km/h avg speed trains should be sped up to at least 80km/h average and 75km/h+ avg speed trains should be sped up to avg over 100km/h.