Blog Entry# 2336628
Posted: Jun 29 2017 (16:30)

4 Responses
Last Response: Jun 29 2017 (21:45)
  
Rail News
0 Followers
1040 views
SCR/South Central  -  IR Press Release 
Jun 29 2017 (15:44)   SCR sets a new record in Electrification of Rail network. 397 Kms of Railway Line electrified during last three months.

Jayashree   38288 news posts
Entry# 2336628   News Entry# 306898         Tags   Past Edits
29-06-2017
The initiative of Shri Vinod Kumar Yadav, General Manager, South Central Railway towards enhancing the pace of completion of projects o­n the Zone has yielded significant results. The Zone has attained a new achievement of completing electrification of railway lines o­n its network to the extent of 397 Kms during the first quarter of the current fiscal i.e. April - June 2017 three month period. This record completion of 397 Kms electrification comes in comparison to 93 Kms commissioned during the last fiscal of 2016-17 and sets a high benchmark, reached for the first time.
The
...
more...
sections completed during April - June 2017 are:
ØGuntakal - Chiksugur for a distance of 135.58 Route Kms
ØNallapadu - Cumbum for a distance of 164.48 Route Kms
ØGuntakal - Dhone for a distance of 69 Route Kms
ØGooty - Pendekallu for a distance of 28 Route Kms
Electric traction continues to play a dominant role in the Railway since it is a clean technology and energy efficient mode of transport. Electric traction is best suited for massand rapid transport, it reduce running time of passenger trains and makes possible to run longer train. Being energy efficient system it is also preferred for long and heavy freight trains to ensure quicker transportation of goods.
In South Central Railway electrification has been under progress o­n large scale. In current financial year, in addition to the 397 Route Kms electrified, it is planned to complete electrification in several other stretches too.
The Guntakal - Wadi section which includes the newly electrified Guntakal - Chiksugur section has already been commissioned for rail services with electric loco motives hauling the trains. This has made seamless operation of trains o­n electric traction without any change of locomotive from New Delhi to Bengaluru via Secunderabad. The Bengaluru-Hazrat Nizamuddin Rajdhani Express via Secunderabad will be running o­n electric traction entirely between the two destinations. Commissioning of electrification o­n this section has speeded up the coal transportation to Raichur thermal power plant.
In Nallapadu - Cumbum section, inspection of Commissioner of Railway Safety is completed and clearance has been received. It is planned to run passenger train o­n electric traction from Tenali - Markapur shortly. Freight train has already started running by electric locomotives from Nallapadu - Cumbum.
In Guntakal - Dhone and Gooty - Pendekallu section the inspection of CRS has been completed and clearance obtained. Electrification of these two sections increases the capacity of train movements and speeding of rail services, o­n the Guntakal - Gooty - Pendekallu triangle, thereby significantly improving the rail services to Bengaluru and Chennai, Vijayawada and Secunderabad.
The stress of General Manager towards speedier electrification of Railway lines is in tune with the objective of strengthening of rail infra to run more services and also reduce carbon footprints o­n account of running diesel traction which results in pollution.

  
1554 views
Jun 29 2017 (16:30)
   2470 blog posts   4 correct pred (67% accurate)
Re# 2336628-1            Tags   Past Edits
Great work by SCR.

  
1528 views
Jun 29 2017 (16:36)
AgnataVasi   941 blog posts   46 correct pred (54% accurate)
Re# 2336628-2            Tags   Past Edits
3 months me ka ha hua hai nallapudu to cumbum 3 mahine hua hi nahi

  
1554 views
Jun 29 2017 (16:42)
Phaneendra Kumar   19 blog posts
Re# 2336628-3            Tags   Past Edits
Though the efforts are commendable , not much can be perceived on the ground as the balance of dhone-cumbum region holds the key for bza-sbc e loco travel. Also until the completion of GTL-Kalluru doubling and electification gets completed , all the trains on eloco from wadi have to divert to GTL-gooty-Kalluru. The success depends on the timely completion of these minor stretches.

  
1194 views
Jun 29 2017 (21:45)
Guest: 71f5654f   show all posts
Re# 2336628-4            Tags   Past Edits
Good nice news SCR.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Dec 27
Trains with ARP 15 Dep on: Mon Jan 1
Trains with ARP 30 Dep on: Tue Jan 16
Trains with ARP 120 Dep on: Mon Apr 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...