Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Oct 18, 2017 14:55:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Oct 18, 2017 14:55:07 IST

Blog Entry# 2348857
Posted: Jul 10 2017 (23:30)

1 Responses
Last Response: Jul 10 2017 (23:30)
  
Rail News
0 Followers
472 views
Commentary/Human InterestECoR/East Coast  -  
Jul 10 2017 (22:51)   Nabarangpur district finds place on Railway map

rdb*^   132807 news posts
Entry# 2348857   News Entry# 308003         Tags   Past Edits
With the Ministry of Railways sanctioning the new broad gauge (BG) line between Jeypore and Nabarangpur as per the announcement in the 2016-17 Railway Budget, Nabarangpur district will now come in the railway map of India.
The Odisha Government will bear the entire cost of land and 50 per cent of the construction cost of the project. The Government had signed an MoU with the Railway Ministry at New Delhi on October 10, 2016 to share the cost of the project.
The project cost of the 38-km line is `747.91 crore. The project
...
more...
will be completed in three years. The railway line will connect Nabarangpur with Jeypore, an existing station on Kottavalasa-Kirandul line. This line will provide connectivity to important towns including Koraput, Jeypore, Jagdalpur, Dantewada. Besides, the railway line will connect Nabarangpur to Junagarh in Kalahandi district.
Several BJD leaders from the undivided Koraput district, including Scheduled Caste and Scheduled Tribe Development Minister Ramesh Majhi, BJD MPs from Koraput and Nabarangpur Jhina Hikaka and Balabhadra Majhi respectively, Rakya Sabha member AV Swami, BJD MLAs from undivided Koraput district, Chairperson of Odisha Film Development Corporation Munna Khan and chairperson of Odisha State Commission for Women Lopamudra Buxipatra thanked the Chief Minister at Naveen Nivas for taking initiative to get the project sanctioned.

  
1302 views
Jul 10 2017 (23:30)
   2345 blog posts   4 correct pred (67% accurate)
Re# 2348857-1            Tags   Past Edits
Nice initiative by IR and ECoR.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Oct 28
Trains with ARP 15 Dep on: Thu Nov 2
Trains with ARP 30 Dep on: Fri Nov 17
Trains with ARP 120 Dep on: Thu Feb 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.