I was also thinking it must be extended to vskp and svdk on other side along with bifurcation of these as 2 trains with same route and change of timings as muri to chunar is starving for connectivity
The 2 trains would be
Sbp/vskp-svdk exp ( east coast based train )
Tata-jat ( SER based train )