Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Dec 15, 2017 19:47:13 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Dec 15, 2017 19:47:13 IST

Blog Entry# 2794048
Posted: Nov 20 2017 (20:42)

25 Responses
Last Response: Nov 24 2017 (18:19)
  
Rail News
0 Followers
946 views
IR AffairsNER/North Eastern  -  
Nov 20 2017 (20:07)   आरवीएनएल ने गाजीपुर रेल कम रोड ब्रिज का किया निरीक्षण

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   7491 news posts
Entry# 2794048   News Entry# 322976         Tags   Past Edits
सुहवल (गाजीपुर):केंद्रीय रेल मंत्रालय भारत सरकार के टेक्निकल एडवाइजरी बोर्ड के अधिकारियों ने गंगा नदी पर हमीद सेतु के बगल में बन रहे रेल कम रोड ब्रिज का शुक्रवार की देर शाम निरीक्षण किया। टेक्निकल एडवाइजरी बोर्ड के चेयरमैन व टीम ने अपने मातहत कर्मचारियों व कार्यदायी संस्था के अधिकारियों संग बैठक कर आवश्यक दिशा निर्देश दिए।
उन्होंने अधीनस्थ अधिकारियों व कार्यदायी संस्थान के कर्मचारियों को निर्देशित किया कि चल रहे निर्माण कार्यों की प्रगति रिपोर्ट प्रत्येक सप्ताह दिल्ली एडवाईजरी कमेटी सहित रेल मंत्रालय व भारत सरकार को दी जाय। साथ ही संभावित दुर्घटनाओं को लेकर जीरो एक्सीडेन्ट के तहत कार्य करने पर जोर दिया। नदी में पीलरों के निर्माण को लेकर का¨स्टग, ¨स¨कग कार्यों का बारीकी से अवलोकन करने के साथ
...
more...
जमीन से निकलने वाले बालू मिट्टी व कंक्रीट के बारे में जानकारी ली। कहा कि भूमि से निकलने वाले हर चीजों का लैब में परीक्षण करा इसकी रिपोर्ट दी जाय। उसके उपरांत अधिकारियों ने स्टीमर में सवार हो गंगा नदी में निरीक्षण किया। इस दौरान उन्होंने सैंड फि¨लग का स्थलीय परीक्षण किया। उसके बाद उनका काफिला सीधे मेदनीपुर स्थित रेलवे प्लांट पहुंचा। वहां उन्होंने पूरे परिसर आफिसों का निरीक्षण किया। इसके बाद वाराणसी के लिए रवाना हो गए। निरीक्षण के दौरान चेयरमैन आरआर जगुहार, प्रोफेसर प्रेम कृष्णा, विकास चन्द्रा, सत्यम् कुमार, पीके ¨सह, उपेन्द्र जी शुक्ल आदि थे।

1 posts - Mon Nov 20, 2017

9 posts - Tue Nov 21, 2017

10 posts - Wed Nov 22, 2017

  
371 views
Nov 22 2017 (18:06)
Ghazipur weds dildar Nagar 👨‍❤‍👨~   454 blog posts   8 correct pred (56% accurate)
Re# 2794048-23            Tags   Past Edits
Koi new rail service nahi hai bhai..😂😂😂

  
366 views
Nov 22 2017 (18:09)
Ghazipur weds dildar Nagar 👨‍❤‍👨~   454 blog posts   8 correct pred (56% accurate)
Re# 2794048-24            Tags   Past Edits

  
280 views
Nov 23 2017 (17:04)
chandankumarsingh64~   718 blog posts
Re# 2794048-25            Tags   Past Edits
why?

  
273 views
Nov 23 2017 (17:09)
chandankumarsingh64~   718 blog posts
Re# 2794048-26            Tags   Past Edits
give me ans.

  
701 views
Nov 24 2017 (18:19)
Ghazipur weds dildar Nagar 👨‍❤‍👨~   454 blog posts   8 correct pred (56% accurate)
Re# 2794048-27            Tags   Past Edits
Manoj sir ne koi new rail service dildar Nagar Ko nhi di to Mai kya karu???

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 25
Trains with ARP 15 Dep on: Sat Dec 30
Trains with ARP 30 Dep on: Sun Jan 14
Trains with ARP 120 Dep on: Sat Apr 14

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.