Statutory Inspection of RE works followed by speed trial at full sectional speed (100 Kmph) in Phagwara Jn- Nawanshahar Doaba Jn (35RKM /44TKM) single line section of FZR Div. of NR completed. With this, CORE achieves 3869.391RKM/5407.01TKM in (22-23).
#Electrification