1. Upgrade tracks increase MPS
2. Reduce Slack time
3. Divert freights to EDFC
4. Divert GKPs side trains via STP, Burhal Jn
5. Avoid halt at LKO(NR), opt Ashbagh, GTNR etc
please wait...Translate to English1. Upping tracks to make trains faster
2. Cut the chill time
3. Send goods to EDFC
4. Send side trains from GKPs through STP, Burhal Jn
5. Skip stop at LKO(NR), choose Ashbagh, GTNR, and the like