Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 04:59:31 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 04:59:31 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by sriramreddy
Page#    7 Blog Entries  next>>
  
Predictions: 40
confirm: 40
rac: 0
wl: 0
Journey: Mon Nov 09, 2015 @ 16:50
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 57   |   Charting: < 12:45
Travel: INDB/Indore Junction BG   to   MAS/Chennai Central   |   1744 km / 2652 km
22645/Ahilya Nagari SF Express
Entry# 1635519

Posted by: sriramreddy   2 blog posts   2 correct pred (67% accurate)
PNR: 824-xxxxxxx   |   Similar PNRs
Posted Status as of: Nov 02 2015 (14:47)
Passenger 1: RAC 11 (Booking Status: W/L 13,GNWL)
Passenger 2: RAC 12 (Booking Status: W/L 14,GNWL)
Passenger 3: Waitlist# 1 (Booking Status: W/L 15,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 09 2015 (13:18)
Passenger 1: B1,25 [LB] (Booking Status: W/L 13,GNWL)
Passenger 2: B1,28 [LB] (Booking Status: W/L 14,GNWL)
Passenger 3: B1,26 [MB] (Booking Status: W/L 15,GNWL)
Chart PREPARED

  
3761 views
Nov 09 2015 (12:43)
ஆர் பி கெ~   774 blog posts   9878 correct pred (86% accurate)
Re# 1635519-1            Tags   Past Edits
#racallocation 12 in 3A end to end(INDB - TVC).
  
Predictions: 22
confirm: 21
rac: 1
wl: 0
Journey: Sat Aug 01, 2015 @ 18:20
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 116   |   Charting: < 14:15
Travel: SBC/KSR Bengaluru City Junction (Bangalore)   to   KCG/Hyderabad Kacheguda   |   627 km / 627 km
12786/KSR Bengaluru City - Kacheguda SF Express (PT)
Entry# 1553667

Posted by: sriramreddy   2 blog posts   2 correct pred (67% accurate)
PNR: 431-xxxxxxx   |   Similar PNRs
Posted Status as of: Jul 30 2015 (10:28)
Passenger 1: RAC 16 (Booking Status: W/L 49,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 50,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 01 2015 (13:11)
Passenger 1: Confirmed (Booking Status: W/L 49,GNWL)
Passenger 2: Confirmed (Booking Status: W/L 50,GNWL)
Chart NOT Prepared

  
1410 views
Jul 30 2015 (20:36)
S VeRmA*^~   6278 blog posts   128918 correct pred (90% accurate)
Re# 1553667-1            Tags   Past Edits
#RACallocation 16 in AC-3 from EnD to EnD.
  
Predictions: 2
confirm: 2
rac: 0
wl: 0
Journey: Tue Oct 21, 2014 @ 12:42
Class: Sleeper - SL   |   Tot Seats: Avbl >106
Travel: RIG/Raigarh   to   BSP/Bilaspur Junction   |   132 km / 2368 km
18477/Kalinga Utkal Express (PT)
Entry# 1251597

Posted by: sriramreddy   2 blog posts   2 correct pred (67% accurate)
PNR: 623-xxxxxxx   |   Similar PNRs
Posted Status as of: Oct 20 2014 (17:53)
Passenger 1: Waitlist# 90 (Booking Status: W/L 141,RLGN)
Passenger 2: Waitlist# 91 (Booking Status: W/L 142,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 20 2014 (21:00)
Passenger 1: Waitlist# 52 (Booking Status: W/L 141,RLGN)
Passenger 2: Waitlist# 53 (Booking Status: W/L 142,RLGN)
Chart PREPARED

  
1453 views
Oct 20 2014 (20:22)
Jai Ho ™^~   12214 blog posts   121227 correct pred (75% accurate)
Re# 1251597-1            Tags   Past Edits
Stamp it...
  
Predictions: 7
confirm: 1
rac: 0
wl: 6

[overstamped]
Journey: Thu Jul 03, 2014 @ 20:50
Class: AC 3-tier - 3A   |   Tot Seats: Avbl >20
Travel: JSG/Jharsuguda Junction   to   SA/Salem Junction   |   1673 km / 2362 km
18189/Tatanagar - Alappuzha Slip Express (PT)
Entry# 1153503
 

Posted by: sriramreddy   2 blog posts   2 correct pred (67% accurate)
PNR: 662-xxxxxxx   |   Similar PNRs
Posted Status as of: Jul 03 2014 (11:06)
Passenger 1: Confirmed (Booking Status: B2,56,CK)
Passenger 2: Waitlist# 1 (Booking Status: W/L 1,CK)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jul 03 2014 (22:38)
Passenger 1: B2,56 (Booking Status: B2,56,CK)
Passenger 2: Waitlist# 1 (Booking Status: W/L 1,CK)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart PREPARED

  
2082 views
Jul 03 2014 (22:15)
Jai Ho ™^~   12214 blog posts   121227 correct pred (75% accurate)
Re# 1153503-1            Tags   Past Edits
Why tagged as cnf? #admins

1 posts are hidden.
  
Predictions: 16
confirm: 14
rac: 1
wl: 1
Journey: Tue Sep 03, 2013 @ 23:05
Class: AC 3-tier - 3A   |   Tot Seats: Avbl >20
Travel: R/Raipur Junction   to   RIG/Raigarh   |   243 km / 2088 km
12833/Ahmedabad - Howrah SF Express (PT)
Entry# 841511
 

Posted by: sriramreddy   2 blog posts   2 correct pred (67% accurate)
PNR: 821-xxxxxxx   |   Similar PNRs
Posted Status as of: Sep 02 2013 (13:29)
Passenger 1: Waitlist# 13 (Booking Status: W/L 15,RLGN)
Passenger 2: Waitlist# 14 (Booking Status: W/L 16,RLGN)
Passenger 3: Waitlist# 15 (Booking Status: W/L 17,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Sep 03 2013 (22:23)
Passenger 1: B1,21/Coach Position:4 (Booking Status: W/L 15,RLGN)
Passenger 2: B1,22/Coach Position:4 (Booking Status: W/L 16,RLGN)
Passenger 3: B1,24/Coach Position:4 (Booking Status: W/L 17,RLGN)
Chart PREPARED

  
1864 views
Sep 02 2013 (22:40)
Ankit*^~   3166 blog posts   121166 correct pred (79% accurate)
Re# 841511-1            Tags   Past Edits
Final #confirm
Page#    7 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.