Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Nov 20, 2017 15:29:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Nov 20, 2017 15:29:28 IST

Blog Entry# 1976333
Posted: Aug 30 2016 (14:57)

2 Responses
Last Response: Aug 30 2016 (14:59)
  
Rail News
0 Followers
959 views
Other News
Aug 30 2016 (14:54)   Power Grid to electrify 1,000 km of rail tracks on pilot basis
 

Jayashree ❖ Amita*^   38182 news posts
Entry# 1976333   News Entry# 278538         Tags   Past Edits
Power Ministry is looking to engage Power Grid Corp (PGCIL) to electrify 1,000 km of rail tracks on a pilot basis, as part of plans to energise 35,000 km of unelectrified lines.
The electrification project will help the government cut down crude imports and also ensure faster movement of trains on these tracks.
In the first phase, the electrification project will cover 16,000 km of busy tracks out of 35,000 km of unelectrified lines in the country. The electrification of tracks will help railways save around Rs 8,000 crore annually.
Indian
...
more...
railways consumes around 2.8 billion litres of diesel annually, costing around Rs 18,000 crore -- nearly 18 per cent of its working expenses.
"The Railway Ministry has started work on it (rail electrification). In a small pilot, we will involve PGCIL because we have not done this in the past," Power Minister Piyush Goyal told PTI.
Goyal further said, "We are discussing that first PGCIL will do a pilot of 1,000 km to assess its capability. Railways has assessed that it is viable for doing electrification of around 16,000 km of tracks."
However, the diesel consumption on remaining 19,000 km of unelectrified tracks is not much. Thus the investment on electrification of these tracks will not offset savings.
Earlier in March this year, Goyal had announced the government's plans to electrify 35,000 km tracks by state-owned power companies over a period of three years.
He further said, "We are going to stop production of diesel locomotives that is the decision which Suresh ji (Railway Minister Suresh Prabhu) will take quickly. I hope that it (electrification) would be done in the next three years. I want to do it in three years."
The minister had also said, "Rs 1 crore per km is the current cost of rail electrification. If we do it in three years, the cost will come down to half. But it cannot be less than 30-35 per cent. The Power Ministry will spend entire money."
According to the Minister, the electrification of entire rail tracks in the country will lead to power consumption going up by 7 billion units.
Railways, which procures power from distribution companies, spends about Rs 12,300 crore a year to purchase 17.5 billion units of electricity.
On the power front, railways is planning to save Rs 3,000 crore in sourcing electricity by proposing to procure power through competitive bidding.
Besides, the Railways has also rolled out plans to set up 1,000 MW solar power plants at railway lands and rooftops of railway buildings with support from the Ministry of New and Renewable Energy over the next five years.

  
1525 views
Aug 30 2016 (14:57)
Pained to know Boeing 777 landcrashed~   23281 blog posts   21101 correct pred (68% accurate)
Re# 1976333-1            Tags   Past Edits
Jis tezi se electrification ki taiyyari ho rahi h lagta h savi diesel locos Bangladesh bhej diye jayenge...

  
1616 views
Aug 30 2016 (14:59)
Proud atheist~   4562 blog posts   37 correct pred (63% accurate)
Re# 1976333-2            Tags   Past Edits
Electrification to bahut tezi se kar rahe hain par itni hi tezi se Madhepura eloco factory ko bhi banana chahiye warna eloco ki aur bhi zyada shortage ho jaegi

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Nov 30
Trains with ARP 15 Dep on: Tue Dec 5
Trains with ARP 30 Dep on: Wed Dec 20
Trains with ARP 120 Dep on: Tue Mar 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.