The train left NDLS exactly on time. 1A coach is clean, one seat coming on at Jhansi tonight, and 2 seats getting off at Kopargaon in the Coupe H. Our WAP7 had some power issues, and first the HOG was switched off, then the entire engine was replaced by a WAG9! All pics of the trip here https://photos.app.goo.gl/efJLbYpeNtoVqQDp6
@RRI 8 km <--> 5 km @VBR 35m late@VBR: Vambori &101 km/h surprised to see it's still a single line here. But work is going on all the way, I'm guessing doubling will be done in a year or two.