Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

Ganga Sagar Express - सारे तीर्थ बार-बार, गंगासागर एक बार - Rahul Kumar

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sun Nov 28 22:41:53 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Advanced Search

News Posts by kirk781

Page#    Showing 1 to 2 of 2 news entries  
Nov 22 (08:21) This swanky new pod hotel just came up at Mumbai Central railway station (www.cntraveller.in)
New Facilities/Technology
WR/Western
0 Followers
4943 views

News Entry# 470599  Blog Entry# 5139269   
  Past Edits
Nov 22 2021 (08:21)
Station Tag: Mumbai Central/MMCT added by kirk781/2118456
Stations:  Mumbai Central/MMCT  
Clean, compact and comfortable: it looks like something you'd see at a train station in Japan, but this new pod hotel is in Mumbai. Launched on Wednesday, this new facility at the Mumbai Central railway station offers travellers a much-needed option to rest it out before or after a long journey. 
Pod hotel at Mumbai Central
The pod hotel will be run by Urban Pod, a company that specialises in this format of capsule hotels. As per information on their website, the pod hotel at Mumbai Central will offer:
News
...
more...
agencies report that tariff starts at Rs999 for 12 hours and Rs1,999 for 24 hours (per pod). Reservations are to be made through IRCTC.
Nov 08 (16:23) Swarajya Vande Bharat Train Replica To Replace Fairy Queen In Rail Bhawan (swarajyamag.com)
IR Affairs
0 Followers
4672 views

News Entry# 469492  Blog Entry# 5116411   
  Past Edits
This is a new feature showing past edits to this News Post.
Fairy Queen was certified by the Guinness Book of Records in 1998 as the world's oldest steam locomotive in regular operation.

Opting for changes in its approach and outlook, Indian Railways is replacing the replica of Fairy Queen heritage steam locomotive placed in front of Rail Bhawan for years with a mini replica of the semi-high speed Vande Bharat train, an indication of the national transporter's focus on the train set and new-age train.
...
more...

Fairy Queen was certified by the Guinness Book of Records in 1998 as the world's oldest steam locomotive in regular operation.

While the Railways is racing against time to quickly build 75 indigenously designed, semi-high speed Vande Bharat trains by August 2023, a deadline publicly set by Prime Minister Narendra Modi, the Integral Coach Factory in Chennai is finalising the replica of Vande Bharat train.

Train Set and semi-high speed are two priority areas for the Railways now as the public transporter has undertaken a series of efforts to speed up trains and reduce loco-hauled trains.

According to the ICF, besides the replica of Vande Bharat, the Chennai-based production unit is also expected to roll out the first prototype of Vande Bharat train with 16 coaches in March to be followed by the second one in April next year.

Gearing up to meet the target, the Railways has called an urgent meeting of Integral Coach Factory and Medha to sort out certain issues to ensure the roll out of the first prototype of Vande Bharat train in March.

After the prototype becomes ready, there will be a three-stage trial of the train before launching the commercial trial.

First, there will be a dynamic trial to be followed by oscillation trial and then static trial. Sources at ICF said the commercial run is expected to start in June for three months after which it will be dedicated to the nation in August.

While Medha has won the contract to manufacture 44 Vande Bharat trains, the Railways has floated another tender for manufacture of 58 more such semi-high speed Vande Bharat trains.

Prime Minister Narendra Modi had said from the ramparts of the Red Fort, “During these 75 weeks of the Amrit Mahotsav of Independence (March 12, 2021, to August 15, 2023), 75 Vande Bharat trains will connect every corner of the country.”

Though the Railways initially planned all 44 trains to be manufactured in ICF, it later decided to distribute their production among three factories — 24 in ICF and 10 each in Modern Coach Factory (MCF), Raebareli, and Rail Coach Factory (RCF), Kapurthala, to fast-track delivery.

The Railways in September last floated a revised tender for procuring 44 semi-high speed Vande Bharat trains, mandating 75 per cent domestic components, making it a domestic tender.

There are two Vande Bharat trains already in operation in the country.

Vande Bharat trains are equipped with upgraded amenities as well as better seating, security, and surveillance systems along with fire-proof features.
Page#    2 news entries  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy